![]() This requires an integrated flow of information across all operating levels and locations. To ensure the highest possible productivity at the same time, it has to be possible to make prompt, target-oriented decisions regarding process optimization at all levels of a company. Manufacturing processes are becoming more and more complex against a background of ever increasing quality requirements coupled with fast product changes and frequent modifications. SIMATIC WinCC supports short Time-to-Market when building new plants and achieves a minimum of downtime when doing plant modifications because of its efficient engineering tools.Įfficient operations management – the WinCC Runtime functionality One response to this pressure has to be efficient engineering on the SCADA layer. Intelligent tools for efficient engineeringĭue to the permanently increasing level of automation and the related complexity of the plants the cost – and time – pressure is increasing because of the international competition. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |